03/29/01
ZOO PREDITOR CONTAINMENT BUILDING
CONSTRUCTION DOCUMENT
Project Area 1930 Square Feet
94
1707
CSI |
Description |
Total $ |
Percent |
Cost/SF |
||
|
01 |
General Requirements |
65,351 |
12.38% |
33.86 |
||
|
02 |
Site Work |
5,300 |
1.00% |
2.75 |
||
|
03 |
Concrete |
18,493 |
3.50% |
9.58 |
||
|
04 |
Masonry |
83,781 |
15.87% |
43.41 |
||
|
05 |
Metals |
12,195 |
2.31% |
6.32 |
||
|
06 |
Wood & Plastics |
40,783 |
7.73% |
21.13 |
||
|
07 |
Moisture-Thermal Control |
16,588 |
3.14% |
8.60 |
||
|
08 |
Doors, Windows & Glass |
157,253 |
29.79% |
81.48 |
||
|
09 |
Finishes |
6,976 |
1.32% |
3.61 |
||
|
10 |
Specialties |
948 |
0.18% |
0.49 |
||
|
11 |
Equipment |
250 |
0.05% |
0.13 |
||
|
15 |
Mechanical |
65,662 |
12.44% |
34.02 |
||
|
16 |
Electrical |
54,281 |
10.28% |
28.12 |
||
|
|
Job total |
|
$527,863 |
100.00% |
$273.50 |
|
|
|
Profit |
10% |
$52,786 |
|
|
|
|
|
Bond |
1% |
$5,279 |
|
|
|
|
|
Contingency |
5% |
$26,393 |
|
|
|
|
|
Grand Total |
|
$612,321 |
|
$317.26 |
|